2XU Office Space

This project was delivered under a Design and Construct methodology, integrating a base build infrastructure upgrade within a fit-out brief.

The main challenges included the base build modifications of a structural layout not suited to the open plan and industrial design intent.

With an accelerated construction program the Conslt team provided solutions-based considerations such as new slab infills and structural steel framework in order to provide the foundation needed to construct the built form elements of the project.

This project won a Silver Melbourne Design Award in 2020.

  • Client

    2XU

  • Size

    1500m2

  • Architect

    CIA Design & Aston Consulting

  • Delivery Model

    Early Contractor Involvement to D&C