CCVT Steeples Church

This project was awarded during complicated and very demanding market times of the ‘Covid’ era. The project was 50% documented and awarded on this basis through a changed procurement model post tender. In what has been very difficult times with regards to time frames with building permits and FRV requirements together with extensive planning changes mid way through the project it has been a valuable and sometimes difficult process which gives Conslt great experience in dealing with difficult process requiring alternate solutions.

The buildings consist of 3 stages and extensive structural and services upgrades due to the much smaller previous footprint together with the aged environment of the existing
structures. New Fire Booster, Stormwater Reticulation and Substantial Electrical
Switchboard Upgrades are the unseen improvements which takes this location into the future.

  • Client

    Steeples Church

  • Size

    1500m2

  • Architect

    BBP Architects

  • Delivery Model

    D&C

We use cookies to give you the best experience.