Construction works at for Interflora’s head office consisting of a hard refurbishment of a 100 year old warehouse to be rectified into 2 storey office space with a rooftop deck.
Full structural upgrade to the existing building maintaining only the perimeter brick walls that required strengthening and redoing the level 1 slab with a new roof structure. A very complicated site to work off with protection requirements adhered to ensure buildability and safety for those within the vicinity of the build.
Conslt has provided critical knowledge on the buildability of the project to ensure a seamless construction.